How long does a tiled shower take?expand_more
Usually four to seven working days for demolition, substrate, waterproofing, setting, and grout, with cure time built in between steps. Anyone promising a finished shower in two days is skipping something that needs to dry.
Is grout sealing necessary?expand_more
Cement grout benefits from it, especially on floors and in wet areas. Epoxy grout doesn't need sealing and resists staining, at the cost of a harder installation and a higher price. Neither substitutes for waterproofing behind the tile.
Can new tile go over the old?expand_more
On some floors, technically yes, but it raises the height at doors and transitions and buries whatever condition the old substrate is in. In a shower it's a firm no — you cannot inspect or repair the waterproofing under existing tile, and that's the part that fails.
Do tile jobs need a permit?expand_more
Tile itself generally doesn't. But if the work involves moving plumbing, altering a shower pan drain, or changing framing, that portion is permitted through Portland Permitting & Development. Most bathroom retiles that stay in the same footprint don't trigger it.