How long does a tiled shower take?expand_more
Usually four to seven working days for demolition, substrate, waterproofing, setting, and grout, with cure time built in between steps. Anyone promising a finished shower in two days is skipping something that needs to dry.
Is grout sealing necessary?expand_more
Cement grout benefits from it, especially on floors and in wet areas. Epoxy grout doesn't need sealing and resists staining, at the cost of a harder installation and a higher price. Neither substitutes for waterproofing behind the tile.
Can new tile go over the old?expand_more
On some floors, technically yes, but it raises the height at doors and transitions and buries whatever condition the old substrate is in. In a shower it's a firm no — you cannot inspect or repair the waterproofing under existing tile, and that's the part that fails.
Do tile jobs need a permit?expand_more
Tile itself generally doesn't. But if the work involves moving plumbing, altering a shower pan drain, or changing framing, that portion is permitted through Portland Permitting & Development. Most bathroom retiles that stay in the same footprint don't trigger it.
Why do quotes vary so much for the same tile?expand_more
Because they are usually not the same job. Differences hide in substrate preparation, whether waterproofing is included, whether the old floor is being removed or covered, and how the setter handles the layout at edges and transitions. Ask all three quotes to state substrate, waterproofing and demolition explicitly, and the spread usually explains itself.
Is large-format tile a problem in an older Portland house?expand_more
It can be. Large tiles need a genuinely flat substrate — the bigger the tile, the less variation it tolerates before corners lip. In a century-old house with a settled floor, that often means levelling work first. It is entirely doable, it just needs to be in the quote rather than discovered on installation day.