Does West Linn solar work require permits?expand_more
Solar and related structural, service, panel, circuit, storage, and equipment work can require permits. Confirm the address and complete design with West Linn before construction.
Should the roof be checked before solar design?expand_more
Yes. Record roof covering, age and condition, framing information, shade, obstructions, drainage, access, and attachment and flashing requirements.
Who can perform the electrical work?expand_more
Verify the appropriate Oregon electrical business and personnel for regulated work and the CCB record for the contracting business.
Can a battery power the whole house?expand_more
That depends on equipment, selected circuits, starting loads, controls, reserve settings, and usage. Require a defined backup-load plan and operating tests.
When can the system be turned on?expand_more
Follow permit, inspection, and utility interconnection requirements and do not assume installation completion equals permission for normal operation or export.
Are incentives guaranteed?expand_more
No. Verify current utility, property, equipment, contractor, timing, and application eligibility with the responsible program before relying on an incentive.
What should commissioning prove?expand_more
Test production, monitoring, shutdown, communications, backup or storage modes, EV or load controls, alarms, and recovery as applicable.
What records should the owner receive?expand_more
Collect permits, inspections, utility permission, final design, component and serial list, settings, photos, manuals, warranties, monitoring access, and approved changes.