Does solar always require a panel upgrade?expand_more
No. A licensed designer should evaluate the existing service, panel, load and proposed equipment before selecting the integration method.
Should the roof be replaced before solar?expand_more
Assess roof condition and expected sequencing before installation so removal and reinstallation risk is explicit.
What is a solar one-line diagram?expand_more
It shows the electrical relationship among modules, inverter, disconnects, panels, meter, utility and optional battery equipment.
Will a battery back up the whole house?expand_more
Only if the design and capacity support the identified loads; define protected circuits and demonstrate outage operation.
Which Milwaukie permits apply?expand_more
Electrical permits apply to the electrical work, while structural, planning or other review depends on the installation; confirm the address and design.
Who may perform the electrical work?expand_more
Use the appropriately licensed Oregon electrical business and verify permit responsibility before installation.
What should be tested at commissioning?expand_more
Test startup, shutdown, monitoring, alarms and backup transfer or protected-load operation where included.
What records should the owner receive?expand_more
Keep the one-line diagram, equipment schedule, permits, utility approvals, photos, labels, warranties and operating instructions.