Is the wall between kitchen and living space load bearing?expand_more
In a mid-century ranch, frequently not. In a seventies split-level, frequently yes. It is not a question to answer by knocking — it needs someone reading the framing and what sits above. If it is bearing, the answer is a beam and posts, which is normal work with a real cost.
Do I need a permit for a kitchen remodel here?expand_more
Not for replacing cabinets, counters and appliances in place. You do once plumbing moves, circuits are added, or structure changes. The City of Lake Oswego issues it for addresses inside city limits, and your contractor should pull it.
Can I reface rather than replace cabinets?expand_more
Often, and it is the largest single saving available. Boxes in well-built homes of this era are frequently sound under dated doors. Have a contractor assess the carcasses before assuming they are scrap — refacing gets most of the visual change for a fraction of the cost.
How long will the kitchen be out of use?expand_more
A cosmetic refresh runs one to two weeks. A full remodel that moves plumbing more commonly runs six to ten, driven by cabinet lead times and inspection scheduling. Set up a temporary sink and microwave elsewhere on day one.
Can I switch to induction?expand_more
Often, but the panel decides. Induction needs a dedicated high-amperage circuit, and homes of this era were not built expecting one alongside a heat pump or EV charger. Get the load assessed during design.
How do I compare three bids fairly?expand_more
Write the scope down first — whether fixtures move, who supplies appliances and cabinetry, what the allowances are, and what happens if the subfloor is found damaged. Hand the same page to each contractor, or you are comparing three different projects.
What does this service cost me?expand_more
Nothing. Describing the project and receiving quotes is free, and there is no fee if you hire someone. You pay your contractor for the work, and that is the entire arrangement.
How many contractors will contact me?expand_more
Usually two to four, matched on trade, project size and whether they genuinely work your area. Only those matched to your job see your details.