Should HVAC equipment be sized from square footage alone?expand_more
No. Capacity should reflect the building, envelope, design conditions, occupancy, distribution, and room needs rather than one area number.
Does Oregon City require an HVAC permit?expand_more
Requirements depend on the actual equipment and related mechanical, electrical, plumbing, structural, and fuel work. Confirm the address and full scope with the City.
Should existing ducts be inspected?expand_more
Yes. Document accessible sizing, leakage, insulation, damage, return paths, balance, and limitations before assuming new equipment will perform properly.
What licenses should I verify?expand_more
Verify the Oregon CCB record for the contracting business and the appropriate specialty-trade authority for regulated work in the proposal.
Is an Energy Trust incentive guaranteed?expand_more
No. Check current utility, property, equipment, contractor, application, and timing requirements before relying on an incentive.
What should HVAC commissioning include?expand_more
Use recorded startup, airflow, temperature, controls, safety, electrical, refrigerant or combustion, condensate, and operating-mode checks appropriate to the system.
Who repairs walls after new lines or ducts?expand_more
The contract should assign every penetration, backing, insulation, weather layer, wall, paint, roof, siding, and cleanup responsibility.
What belongs in HVAC closeout?expand_more
Collect permits, inspections, model and serial numbers, commissioning results, settings, manuals, warranty terms, incentive records, maintenance guidance, and a resolved punch list.